Rebuilding Steel Bridge at WSU

Steel Bridge members carrying a previous steel bridge across Thompson Flats (WSU Pullman campus).
$775
38%
Raised toward our $2,000 Goal
5 Donors
19
days left
Project ends on November 13, at 12:00 PM PST
Project Owners

Description

Steel Bridge at WSU: Returning to Competition

After several years of inactivity, Steel Bridge at Washington State University is returning to competition. Our student-led team is preparing for the 2027 American Institute of Steel Construction (AISC) Student Steel Bridge Competition, with the goal of rebuilding a program that provides valuable hands-on engineering experience for WSU students.

Each year, the competition challenges university teams to design, analyze, fabricate, assemble, and test a model bridge made entirely of steel. These bridges are approximately 20 feet long and must support 2,500 pounds. Throughout the process, students gain practical experience in structural design, welding, metal fabrication, teamwork, and problem-solving while applying concepts learned in the classroom.

WSU has a strong history in this competition, including four Pacific Northwest regional championships and six consecutive national competition appearances from 2009 to 2014. We hope to build on that history by reestablishing a successful and sustainable team that students can continue to participate in for years to come.

Donations through CougStarter will help us purchase steel and fabrication materials, safety equipment, and bridge-assembly tools, as well as cover travel and transportation expenses for the 2027 Pacific Northwest regional competition. These resources are essential as we prepare to design, build, and compete with our first bridge since the club's return.

Our goals extend beyond this year's competition. We want to provide current and future WSU students with opportunities to develop practical engineering skills, work collaboratively on a challenging project, and represent the university through a nationwide engineering competition.

We appreciate your support as we work to bring Steel Bridge back to WSU. Thank you, and Go Cougs!

Levels
Choose a giving level

$10

Nuts & Bolts

Every contribution matters. Your support helps cover the essential costs involved in bringing Steel Bridge at WSU back to competition.

$25

The Blueprint

Help turn our plans for returning to competition into reality by supporting the resources needed to move our project forward.

$50

Bridge Builder

Play a part in bringing our competition bridge to life while supporting valuable hands-on engineering opportunities for our students.

$100

Steel Supporter

Help offset the range of project expenses involved in our return to competition, including steel, safety equipment, assembly tools, and transportation.

$250

Legacy Donor

Help fund this year's bridge and competition participation while laying the groundwork for a Steel Bridge program that future WSU students can continue.